Construction workers in safety gear review building plans around a worktable.

August 30th, 2025 - Construction Updates

Exterior making major headway and interior tile and drywall continues.

  • August 30, 2025

Multi-story white stucco building under construction, with red tile roofs, balconies, and materials in the foreground.

August Is About:

  • Finishing The Exterior
  • Continued Drywall & Tile Work

See the below updates on the exterior and interior updates on the The Landings On Amelia River - Building 4.

Highlight Video: Aerial & Interiors

August 30th 2025 Construction Update - The Landings On Amelia River

Tile Work

Unfinished bathroom with marble-look tiled walls, built-in niches, exposed plumbing, and two windows.

Unfinished shower with marble-look tile walls, a built-in bench, and a hexagonal mosaic floor.

Walk-in shower with gray marble walls, a built-in bench, hexagonal floor tiles, and exposed plumbing fixtures.

Outside Building (Waterproof, Stucco, Paint)

Multi-story white residential building under construction with red tile roofs and unfinished balconies

Aerial view of a red-tile-roofed building beside coastal marshes, with rooftop construction materials and equipment.

Three-story building under construction with red tile roofs, construction materials, and a lift outside.

Unfinished terrace with construction debris and a marsh and water view beyond the low wall.

Watch Full Video Of Updates -

John walks through the building with updates of the tile work, drywall, and exterior of the building.

Thank you and stay tuned for more

Construction Updates

Your next chapter begins on the water

The Landings on Amelia River offers a thoughtfully designed condominium community inspired by its natural surroundings and timeless sense of place. Our team is here to provide personalized guidance on available residences, floor plans, and community details as you explore refined waterfront living.

Follow Us on Instagram