Until this summer, the paved trail on the south end of Amelia Island started at Peters Point and ran south along South Fletcher Avenue, under the oaks and past the dunes, to Amelia Island State Park. It was a beach trail. You rode out from the sand, rode back to it, and loaded the bikes into the car.
That changed in late August. The Amelia Island Parkway Trail is 3.2 miles long. It runs from South Fletcher Avenue along the Parkway, through the South 14th Street roundabout, and past Bailey Road to South 8th Street, and it opened to the public on August 25, 2026. Nassau County describes the finished system as "a continuous 12-mile trail from the southend of Amelia Island to South 8th Street." The trail used to stop at a beach parking lot. Now it comes into town at a street with a coffee bar and a bike shop. That makes it a route you can use for errands, not only a loop you drive to.
How four short segments joined two older trails
The county built the island's trail network in pieces, years apart. The stretch from the south end to Peters Point Beachfront Park was built in 2011. The Amelia River to Sea Trail, from Crane Island to the Simmons Road beach access, followed in 2019. For years, the gap between them was the Parkway itself.
The county closed that gap in four segments:
- South Fletcher Avenue to Via del Rey. Work began August 16, 2023, and was finished by spring 2024.
- Via del Rey to South 14th Street.
- South 14th Street to Bailey Road.
- Bailey Road to South 8th Street.
The last three segments, along with the new roundabout, were finished this summer. The Friends of the Amelia Island Trail say the project started as a vision about a decade ago. Grants paid for nearly all of it. The Florida Department of Transportation's Local Agency Program provided $998,607 for Segment 1, and the county's share was $88,971. Segments 2 through 4 were paid for entirely with federal money that FDOT administers, just over $6 million in total. In the county's announcement, Mike Pikula, president of the Friends group, called the trail "another safe walking, running and cycling venue for our residents and guests."
The county held the ribbon-cutting on August 26 at the corner of Amelia Island Parkway and Airport Road and posted a video of the ceremony.
The ride, end to end, with places to stop
With the town end at South 8th Street, the stops along the trail matter more. Every access point now has somewhere to get food, water or a rinse.
Where you join the trail | What's there |
|---|---|
South 8th Street end | Mocama Coffee, 629 South 8th Street, open 7 a.m. to 4 p.m. on weekdays and 8 a.m. to 4 p.m. on weekends. Fernandina Beach Cycling & Fitness, 11 S. 8th Street, sells and repairs bikes. |
South 14th Street and Bailey Road | Savannah Pizza Company, 1925 S. 14th Street, next to Inkwell Art Bar. It does takeout and delivery. |
South Fletcher and the Parkway | Sliders Seaside Grill and Tortuga Jack's, 1998 S. Fletcher Avenue, serves oceanfront dining daily. Lagniappe is at 4810 1st Coast Highway. |
Peters Point | Peters Point Beachfront Park has parking, restrooms, indoor and outdoor showers, and picnic tables. |
South end | Amelia Island State Park, 9550 1st Coast Highway, is open 8 a.m. to sunset year-round and has two parking areas and an outdoor shower. |
Mocama's hours shape the town end. A morning ride from the beach can finish with coffee on 8th Street. An afternoon ride needs to reach town before the 4 p.m. close.
Peters Point is still where the older Amelia Island Trail officially begins. The Friends group lists it as the north trailhead and describes a trail of more than seven miles that runs to its south trailhead at the state park. Inside the park, Florida State Parks describes the Timucuan Trail as connecting north to Peters Point and south to the A1A bridge, toward Big Talbot Island.
One familiar stop on South Fletcher has closed. The Surf, at 3199 S. Fletcher Avenue, served its final meal on Sunday, September 20, after about 70 years, First Coast News reported. The News-Leader reported that a developer plans 13 homes on the 1.86-acre site. That plan is a proposal.
If you don't own a bike, delivery rentals bring one to you. Bike Amelia delivers beach cruisers and takes reservations online. BikeScootOrYak rents bikes and e-bikes with delivery on the island. Pedego Fernandina Beach takes rental bookings at its shop.
On e-bikes, the Friends group's posted rules for the Amelia Island Trail and the Amelia River to Sea Trail allow Class 1, 2 and 3 e-bikes and set a 10-mph maximum for bicycles. This is general information, not legal advice, so check the posted rules before you ride.
The roundabout gets its final paving this weekend
The trail is open, but the intersection that joined it all together is not quite done. The new roundabout at Amelia Island Parkway and Buccaneer Trail was the last link. Through most of the spring, the trail and the sidewalk there were closed, and people had to detour along South Fletcher Avenue.
Final asphalt paving was set for October 10 and 11. Nassau County postponed it because of the weather forecast and rescheduled it for Saturday and Sunday, October 24 and 25, weather permitting. Temporary lighting stays up until the new fixtures on the roundabout's light poles are installed and switched on. The county's September 25 update said the intersection would stay open during paving. Drivers should expect single-lane closures, with flaggers and law enforcement on site to direct traffic. If you ride on October 24 or 25, expect crews at the Buccaneer end of the route.
From 8th Street to the river is the next gap
South 8th Street is now the trail's northern end, and it is also where the off-road route stops. The path does not yet reach downtown, Main Beach or the Egans Creek Greenway.
The next piece is Phase 4 of the Amelia Island Trail. It is a 3-mile extension from the Amelia River to Sea Trail on Simmons Road to Hickory Street, near the Egans Creek Greenway Trail. At a March 4, 2026 public meeting at the Peck Community Center, county staff described plans that include median safety improvements along South 14th Street, new pedestrian flashing beacons at both ends of the section, and upgraded pedestrian detection systems.
Phase 4 is still in design. A June 22, 2026 county agenda item asked for $191,984.32 more in design work, covering sidewalk design, a four-way-stop study, and landscaping and irrigation. It would raise the design contract ceiling to $1,848,406.02 and extend the consultant's contract to April 27, 2028. The same document describes a later segment that would continue to downtown. No construction start date has been set.
The Friends group's February 10, 2026 update lists two more ideas as proposals: a Phase 5 north of SR 200 and 8th Street toward Bonnieview and Clinch Drive, and a Schools-to-Waterfront path. Funding and design for both were still pending at that time.
For this fall, that leaves an off-road route from the state park to a coffee counter on South 8th Street, with the roundabout's last coat of asphalt going down on October 24 and 25.